Gallery 
pixel_trans pixel_trans pixel_trans
Highlight for Album: Chiswick High Road
Chiswick High Road

2nd & 3rd Floor offices at Chiswick High Road, the work comprised of complete stripout of tenants fixtures & fittings and refurbishment of both floors including new lighting, new suspended ceilings, full redecoration, new carpet tiles and left ready for new incoming tenant.


Last changed on 03/14/2011. This album contains 13 items.
This album has been viewed 1316 times since 11/02/2005.
pixel_trans pixel_trans pixel_trans
Highlight for Album: Euston Square Roof Repairs
Euston Square Roof Repairs

Last changed on 06/13/2006. This album contains 6 items.
This album has been viewed 1162 times since 11/02/2005.
pixel_trans pixel_trans pixel_trans
Highlight for Album: Euston Road, London NW1
Euston Road, London NW1

Euston Road, various repairs to the slate roofs and completely removed and recovered a flat roof whilst the office below carried on with its normal daily business.

Another part was to completely redecorate the office area as pictured in the album.


Last changed on 03/14/2011. This album contains 11 items.
This album has been viewed 1166 times since 11/02/2005.
pixel_trans pixel_trans pixel_trans
Highlight for Album: Flanders Way Works Depot
Flanders Way Works Depot

Last changed on 06/13/2006. This album contains 29 items.
This album has been viewed 1311 times since 11/01/2005.
pixel_trans pixel_trans pixel_trans
Highlight for Album: Hackney Town Hall
Hackney Town Hall

Hackney Town Hall Assembly Rooms Entrance Canopy

Carrying out careful removal of the canopy above the entrance to the assembly rooms at Hackney Town Hall, and in the process of liaising with conservation architects & the English Heritage as the building is grade II listed, to reconstruct the canopy to its former glory within their strict guidelines.

Here are a few pictures taken after completion of the canopy to its former glory, the canopy was stripped back to its steel framework and completely re-built adhering to the complicated specification compiled by the Conservation Architects and the English Heritage, including new fibrous plaster moulded Soffit.

Unfortunately the existing stonework was not cleaned as part of this contract.


Last changed on 03/14/2011. This album contains 15 items.
This album has been viewed 1527 times since 11/02/2005.
pixel_trans pixel_trans pixel_trans
Highlight for Album: Picture Gallery
Picture Gallery

Last changed on 03/14/2011. This album contains 24 items.
This album has been viewed 695 times since 03/14/2011.
pixel_trans pixel_trans pixel_trans
Highlight for Album: Woodberry Down School, London N4
Woodberry Down School, London N4

The project involved demolition of the buildings and other portakabins & school keepers lodge and securing the site on completion. As the site is in very close proximity to the remaining school buildings, forward planning and communicating with the local and school authorities proved that our hands on approach really does work.


Last changed on 03/14/2011. This album contains 4 items.
This album has been viewed 1541 times since 11/02/2005.

Powered by Gallery v1 RSS