Refurbishment

HackneyTown Hall, E8 (listed)

Systematic removal of the water damaged Assembly Rooms canopy, liaison with the conservation architects and English Heritage and reconstruction of the canopy within strict guidelines.

Chiswick High Road, W4

Strip out tenants fixtures and fittings and refurbish two floors of office space including lighting, suspended ceilings, redecoration and new carpet.

Euston Road, NW1

Various projects including repairs to slate roof, removal and recovering of flat roof to occupied office space, strip out of previous tenants partitions and redecoration, stone cleaning of an internal light well. Access was limited and prior to commencement, structural engineers load calculations were completed to investigate support for scaffolding.

Horn Park School

Refurbishment of toilets, wash basins, vanity units and cubicles. Wingfield School Strip out and refurbishment of toilets including new toilet cubicles, Altro wall and floor coverings along with bespoke decorative designs.

The Hare, Bethnal Green, E1

Strip out existing bar and floor and rebuild new bespoke bar on site complete with back bar, new electrics, plumbing, flooring, carpet, French polishing of all new joinery.